asbestos-abatement-plan
Drafts an asbestos abatement plan compliant with OSHA 29 CFR 1926.1101 and EPA NESHAP 40 CFR 61 Subpart M. Extracts facility details from uploaded surveys and contractor documents to produce a regulatory filing and operational guide. Use when preparing pre-abatement regulatory submissions, contractor work plans, or facility owner compliance documentation for asbestos removal projects.
Best use case
asbestos-abatement-plan is best used when you need a repeatable AI agent workflow instead of a one-off prompt.
Drafts an asbestos abatement plan compliant with OSHA 29 CFR 1926.1101 and EPA NESHAP 40 CFR 61 Subpart M. Extracts facility details from uploaded surveys and contractor documents to produce a regulatory filing and operational guide. Use when preparing pre-abatement regulatory submissions, contractor work plans, or facility owner compliance documentation for asbestos removal projects.
Teams using asbestos-abatement-plan should expect a more consistent output, faster repeated execution, less prompt rewriting.
When to use this skill
- You want a reusable workflow that can be run more than once with consistent structure.
When not to use this skill
- You only need a quick one-off answer and do not need a reusable workflow.
- You cannot install or maintain the underlying files, dependencies, or repository context.
Installation
Claude Code / Cursor / Codex
Manual Installation
- Download SKILL.md from GitHub
- Place it in
.claude/skills/asbestos-abatement-plan/SKILL.mdinside your project - Restart your AI agent — it will auto-discover the skill
How asbestos-abatement-plan Compares
| Feature / Agent | asbestos-abatement-plan | Standard Approach |
|---|---|---|
| Platform Support | Not specified | Limited / Varies |
| Context Awareness | High | Baseline |
| Installation Complexity | Unknown | N/A |
Frequently Asked Questions
What does this skill do?
Drafts an asbestos abatement plan compliant with OSHA 29 CFR 1926.1101 and EPA NESHAP 40 CFR 61 Subpart M. Extracts facility details from uploaded surveys and contractor documents to produce a regulatory filing and operational guide. Use when preparing pre-abatement regulatory submissions, contractor work plans, or facility owner compliance documentation for asbestos removal projects.
Where can I find the source code?
You can find the source code on GitHub using the link provided at the top of the page.
SKILL.md Source
# Asbestos Abatement Plan Produces a federally compliant abatement plan serving as both a regulatory filing and operational blueprint for ACM removal. Covers scope, containment, removal methodology, worker protection, air monitoring, waste disposal, and final clearance. ## Prerequisites Before drafting, collect: 1. **Asbestos survey report** — inspector name/accreditation, survey date, all ACM locations with material type, condition, friability, mineral type, % content (PLM/TEM), quantities (SF/LF/piece count) 2. **Facility ID** — legal entity, address, parcel/tax ID, county, owner/authorized rep, tenant info if applicable 3. **Contractor credentials** — license number + expiration, EPA accreditation, competent person name/cert number 4. **Project schedule** — start date, phasing, expected completion 5. **NESHAP threshold determination** — total friable ACM quantity; thresholds: >260 LF pipe, >160 SF surfacing, or >1 m³ friable ACM ## Quick Start 1. Extract all project specifics from uploaded documents; use `[INSERT ___]` only where data is unavailable 2. Determine NESHAP notification status — if thresholds met, 10 working days advance notice to EPA regional office + state agency 3. Classify each ACM scope item (Class I/II/III) — Class I triggers most stringent OSHA requirements 4. Draft each output section below in order 5. Flag state-specific requirements that exceed federal minimums ## Output Sections ### 1. Regulatory Authority & Purpose - Cite governing regulations: OSHA 29 CFR 1926.1101; EPA NESHAP 40 CFR 61 Subpart M; applicable state regs - State plan is the controlling document; deviations require written competent-person approval + agency notification - NESHAP notification applicability and deadline - Plan availability for OSHA/EPA/state inspectors and employee representatives ### 2. Project Identification Table with: facility legal name, address/parcel ID, owner/authorized rep, contractor/license/expiration, EPA accreditation, competent person/cert, project dates. Populate from documents. ### 3. Scope of Work & ACM Characterization Reference survey report. Table each ACM location with: material type, friability, condition, asbestos %/mineral, quantity, OSHA class. State aggregate totals and confirm NESHAP threshold status. ### 4. Work Area Preparation & Containment - **Regulated area** — perimeter barriers + OSHA warning signage at all approaches - **Critical barriers** — 6-mil fire-retardant poly, floor-to-ceiling, all seams/penetrations sealed airtight; HVAC/electrical/plumbing sealed - **Negative pressure** — HEPA-filtered machines, ≥4 air changes/hr, ≥−0.02 in. WC differential (verify each shift), continuous through abatement + ≥24 hrs post-cleaning - **Decon enclosure** — three-chamber (equipment → shower → clean room), hot/cold water, overlapping poly curtains - **Pre-abatement prep** — remove/cover furniture with sealed poly, isolate HVAC, seal outlets/fixtures ### 5. Removal Methodology - Keep ACM continuously wetted with amended water (surfactant) from removal through containerization - Work section by section; prefer hand tools over power tools - If cutting unavoidable: wet thoroughly, cut slowly, HEPA local exhaust at cut point - **Waste containerization**: friable → double-bagged 6-mil poly (≤2/3 capacity); non-friable → wetted, poly-wrapped; label all containers with OSHA warning + generator name + date - **Progressive cleaning**: HEPA vacuum each shift-end; post-removal cycle: HEPA vacuum → wet wipe → visual inspection → repeat until clean ### 6. Worker Protection - **Class I PPE**: full-body disposable coveralls with hood/foot coverings; full-face APR with HEPA (APF 50 min) or PAPR (APF 1000); disposable gloves. Half-face not permitted for Class I - **Respiratory program**: PLHCP medical eval, annual fit testing, clean-shaven requirement, seal-check training - **Decon sequence**: (1) equipment room — HEPA vacuum PPE, bag disposables, keep respirator on; (2) shower — full body wash with respirator; (3) clean room — remove respirator, don clean clothing - **Equipment decon**: HEPA vacuum → wet wipe → visual inspection; wrap in poly for transport ### 7. Air Monitoring Protocol | Sample Type | Timing | Locations | Method | Action Level | |---|---|---|---|---| | Background | Pre-abatement | ≥3 outside regulated area | PCM/NIOSH 7400 | Baseline | | Personal | Daily during work | Highest-exposure workers | PCM | PEL 0.1 f/cc TWA; STEL 1.0 f/cc | | Area perimeter | Each shift | Outside barriers, adjacent spaces | PCM | Above background → stop/investigate | | Final clearance | Post-cleaning, ≥24 hr neg. pressure | ≥5 distributed locations | PCM/NIOSH 7400 | ≤0.01 f/cc | - Clearance uses aggressive sampling (fans/blowers, door movement, personnel activity) - Clearance failure → re-clean, re-sample via NVLAP-accredited independent lab ### 8. Waste Management & Disposal - All waste (ACM, PPE, poly, HEPA filters) = RACWM - Secured staging area with warning signs, weather-protected - Licensed hauler, enclosed vehicle, waste shipment record per load - Permitted asbestos landfill; retain signed disposal receipts as permanent records - Maintain tracking log: date, quantity, transporter, destination, shipment record number ### 9. Emergency Procedures | Scenario | Response | |---|---| | Containment breach | Stop work → add negative air → repair → sample adjacent areas → evacuate/clean if fibers confirmed | | Worker injury | First-aid responds with RPE; move injured through decon or provide RPE to responders | | Fire/evacuation | Decon exit if safe; direct exit if imminent danger; decon + medical eval post-event | | Unexpected ACM | Stop area work → competent person evaluates → sample → amend plan → update NESHAP if thresholds now exceeded | ### 10. Final Clearance & Project Closeout **Clearance sequence**: visual inspection (competent person, supplemental lighting) → ≥24 hrs negative pressure → aggressive air sampling (≥5 samples) → lab results ≤0.01 f/cc → release for reoccupancy **Final report must include**: executive summary, work narrative with deviations, all air monitoring results with lab reports/chain of custody, photo documentation (pre/during/post), waste tracking log and shipment records, all licenses/certs, competent person certification statement. **Signatures**: competent person, contractor authorized rep, facility owner authorized rep (name, title, date). **Record retention**: OSHA requires **30-year minimum**. Facility owner maintains as permanent building records accessible to future owners/tenants/contractors. Contractor retains copies; transfers to successor or owner upon cessation. **Post-project filing**: check whether state/local agency requires final report submission (commonly 30 days post-completion). ## Pitfalls & Checks - Extract from documents first — never fabricate project-specific data - Confirm NESHAP notification status before drafting; deadline and responsible party must be explicit - Verify ACM class for every scope item — Class I triggers strictest OSHA requirements - State regs may exceed federal minimums — always flag state-specific requirements - Mark uncertain or potentially amended CFR citations with `[VERIFY]` - Describe performance specs, not commercial product names - Plan must withstand OSHA/EPA scrutiny as a defensible 30-year permanent record
Related Skills
managing-transplant-evaluations
Guides transplant candidacy evaluation with organ-specific criteria and listing documentation. Use when evaluating transplant candidates, documenting listing criteria, or coordinating transplant workups.
managing-radiation-therapy-planning
Structures radiation treatment planning documentation with dose constraints and target volumes. Use when documenting radiation plans, reviewing dose constraints, or coordinating radiation therapy.
managing-dental-implant-planning
Structures implant evaluation with bone assessment, treatment planning, and surgical documentation. Use when planning dental implants, assessing bone adequacy, or documenting implant procedures.
managing-bone-marrow-transplant
Guides BMT/SCT workflow from conditioning through engraftment monitoring and GVHD assessment. Use when managing transplant patients, monitoring engraftment, or assessing GVHD.
creating-treatment-plans-psychiatric
Structures psychiatric treatment plans with diagnoses, goals, interventions, and measurable outcomes. Use when creating psychiatric treatment plans, setting therapeutic goals, or documenting treatment modalities.
creating-rehabilitation-treatment-plans
Develops rehabilitation treatment plans with goals, interventions, and measurable outcome milestones. Use when creating rehab plans, setting therapy goals, or planning intervention progressions.
creating-nursing-care-plans
Develops NANDA-I nursing care plans with nursing diagnoses, outcomes (NOC), and interventions (NIC). Use when creating care plans, selecting nursing diagnoses, or planning nursing interventions.
creating-dental-treatment-plans
Structures dental treatment planning with phasing, cost estimation, and alternative options presentation. Use when creating treatment plans, phasing dental work, or presenting treatment options.
conducting-preoperative-planning
Structures surgical planning with imaging review, risk stratification, and equipment/team requirements. Use when planning surgeries, reviewing preoperative imaging, or coordinating surgical teams.
conducting-discharge-planning-nursing
Coordinates nursing discharge planning with medication teaching, follow-up scheduling, and resource coordination. Use when planning discharge, coordinating post-discharge care, or documenting discharge teaching.
urban-planning-summary
Summarizes legal issues in urban development projects covering zoning, land use disputes, and environmental compliance. Generates structured briefings for municipalities, developers, and legal counsel. Use when reviewing zoning ordinances, land use applications, environmental impact statements, or comprehensive plans before development or planning decisions.
transition-services-plan
Drafts a Transition Services Plan exhibit to an Asset Purchase Agreement, organizing post-closing seller-to-buyer support by functional area with scope, duration, contacts, and deliverables. Triggers on requests for TSA exhibits, transition plans, post-closing support schedules, or operational handover documents in asset purchase transactions.