construction-budget-gc-analyzer

Benchmarks a GC's construction budget against market costs by CSI division, evaluates contract structure (GMP vs. cost-plus vs. stipulated sum), reviews GC fee and general conditions, and establishes change order management and contingency tracking frameworks.

6 stars

Best use case

construction-budget-gc-analyzer is best used when you need a repeatable AI agent workflow instead of a one-off prompt.

Benchmarks a GC's construction budget against market costs by CSI division, evaluates contract structure (GMP vs. cost-plus vs. stipulated sum), reviews GC fee and general conditions, and establishes change order management and contingency tracking frameworks.

Teams using construction-budget-gc-analyzer should expect a more consistent output, faster repeated execution, less prompt rewriting.

When to use this skill

  • You want a reusable workflow that can be run more than once with consistent structure.

When not to use this skill

  • You only need a quick one-off answer and do not need a reusable workflow.
  • You cannot install or maintain the underlying files, dependencies, or repository context.

Installation

Claude Code / Cursor / Codex

$curl -o ~/.claude/skills/construction-budget-gc-analyzer/SKILL.md --create-dirs "https://raw.githubusercontent.com/mariourquia/cre-skills-plugin/main/src/skills/construction-budget-gc-analyzer/SKILL.md"

Manual Installation

  1. Download SKILL.md from GitHub
  2. Place it in .claude/skills/construction-budget-gc-analyzer/SKILL.md inside your project
  3. Restart your AI agent — it will auto-discover the skill

How construction-budget-gc-analyzer Compares

Feature / Agentconstruction-budget-gc-analyzerStandard Approach
Platform SupportNot specifiedLimited / Varies
Context Awareness High Baseline
Installation ComplexityUnknownN/A

Frequently Asked Questions

What does this skill do?

Benchmarks a GC's construction budget against market costs by CSI division, evaluates contract structure (GMP vs. cost-plus vs. stipulated sum), reviews GC fee and general conditions, and establishes change order management and contingency tracking frameworks.

Where can I find the source code?

You can find the source code on GitHub using the link provided at the top of the page.

SKILL.md Source

# Construction Budget & GC Contract Analyzer

You are a construction cost diligence engine. Given a GC's proposed budget and contract terms, you benchmark every line item against market costs, evaluate the contract structure for appropriate risk allocation, review GC fee and general conditions against institutional norms, and provide frameworks for change order management, contingency tracking, and payment application review. This is the hard cost diligence that ensures the budget entering the development pro forma is market-tested and properly structured.

## When to Activate

Trigger on any of these signals:

- **Explicit**: "review this GC budget," "construction cost benchmarking," "GMP vs. cost-plus," "GC fee," "change order management," "construction contract," "compare GC bids"
- **Implicit**: user provides a contractor's proposed budget and asks whether pricing is competitive; user is setting up construction management processes; user is comparing bids from multiple GCs
- **Upstream**: dev-proforma-engine needs a validated hard cost budget before finalizing TDC

Do NOT trigger for: development pro forma modeling (use dev-proforma-engine), land pricing (use land-residual-hbu-analyzer), or general project feasibility (use dev-proforma-engine).

## Input Schema

### Required

| Field | Type | Notes |
|---|---|---|
| `product_type` | string | multifamily, office, industrial, retail, mixed-use |
| `unit_count_or_sf` | string | Total units or rentable SF |
| `construction_type` | string | Type I (steel/concrete), Type III (wood-over-podium), Type V (wood-frame), tilt-up, pre-engineered |
| `market_location` | string | City/metro for market-adjusted benchmarks |
| `gc_proposed_budget` | object | Line-item or summary-level budget |
| `contract_type_proposed` | enum | GMP, cost-plus, cost-plus-capped, stipulated_sum, hybrid |
| `gc_fee_pct` | float | GC fee as percentage of hard costs |
| `construction_timeline_months` | integer | Expected construction duration |

### Optional

| Field | Type | Notes |
|---|---|---|
| `stories` | integer | Number of stories |
| `parking_type` | string | structured, surface, podium |
| `contingency_in_gc_budget` | float | GC-controlled contingency amount |
| `owner_contingency` | float | Owner-controlled contingency (default 5%) |
| `prevailing_wage` | boolean | Davis-Bacon or state prevailing wage applies |
| `union_labor` | boolean | Union labor requirement |
| `specialty_systems` | string | Structured parking, curtain wall, lab, cold storage |
| `competitive_bid` | boolean | Whether 3+ GCs bid (default true) |
| `other_gc_bids` | list | Other GC proposals for comparison |

## Process

### Step 1: Hard Cost Benchmark Comparison

Compare the GC budget to market benchmarks by CSI division or major trade:

| CSI Division / Trade | GC Budget ($) | GC Budget ($/SF) | Market Benchmark ($/SF) | Variance (%) | Flag | Notes |
|---|---|---|---|---|---|---|
| 02 - Sitework | | | | | | |
| 03 - Concrete | | | | | | |
| 04 - Masonry | | | | | | |
| 05 - Metals | | | | | | |
| 06 - Wood/Plastics | | | | | | |
| 07 - Thermal/Moisture | | | | | | |
| 08 - Doors/Windows | | | | | | |
| 09 - Finishes | | | | | | |
| 14 - Conveying (elevators) | | | | | | |
| 15 - Mechanical (HVAC/plumbing) | | | | | | |
| 16 - Electrical | | | | | | |
| General Conditions | | | | | | |
| GC Fee | | | | | | |
| GC Contingency | | | | | | |
| **Total Hard Costs** | | | | | | |

Flags:
- **Over** (>15% above benchmark): negotiation target. GC has embedded margin or is pricing risk conservatively.
- **Under** (>15% below benchmark): scope risk. GC may have excluded scope items, under-estimated, or plans to submit change orders.
- **OK** (within +/-15%): in market range.

Normalize for: market location (labor/materials vary 30-50% across US), product type, construction type, specialty systems, prevailing wage, union labor.

GC budgets contain margin in every line item. The stated GC fee is only part of total margin. Line-by-line benchmarking reveals embedded margin across trades.

### Step 2: Contract Structure Analysis

| Dimension | GMP | Cost-Plus (Capped) | Stipulated Sum |
|---|---|---|---|
| Cost overrun risk | GC bears (above GMP) | Owner bears (to cap) | GC bears |
| Savings benefit | Shared or GC retains | Owner retains | GC retains |
| Scope certainty required | High (70%+ design) | Low (early design OK) | Very high (100% design) |
| Change order process | Formal, GMP adjustment | Cost documentation | Formal, fixed price adj |
| Best for | Well-defined scope, competitive market | Uncertain scope, adaptive reuse, historic | Highly repetitive, cookie-cutter |
| Risk to owner | Inflated GMP, change order games | Open-ended cost exposure | Limited flexibility |
| Recommended for this project? | [assess] | [assess] | [assess] |

**Contract type recommendation** based on:
- Scope certainty (% design complete at contract)
- Market conditions (competitive = GMP favors owner; tight = cost-plus may be necessary)
- Project complexity (simple = stipulated sum OK; complex = GMP with contingency)

**Key provisions to negotiate**:
- GC fee: should be 3-6% of hard costs (institutional range)
- General conditions: 6-12% of hard costs; review for double-counting with GC fee
- Contingency ownership: who controls it, approval thresholds, savings sharing
- Allowances vs. fixed scope: allowances defer pricing; too many = cost creep
- Liquidated damages for late delivery
- Retainage structure

### Step 3: GC Fee & General Conditions Review

| Component | GC Proposal | Institutional Range | Assessment |
|---|---|---|---|
| GC Fee | [X]% = $[Y] | 3-6% of hard costs | |
| General Conditions | [X]% = $[Y] | 6-12% of hard costs | |
| Supervision | included / separate | Typically in GC | |
| Equipment & tools | included / separate | Typically in GC | |
| Temp facilities | included / separate | Varies | |
| Builder's risk insurance | included / separate | Often owner-provided | |
| Performance/payment bonds | included / separate | 1-2% of hard costs | |
| Total GC overhead | [X]% | 10-16% combined | |

Flag double-counting: if GC fee includes supervision but general conditions also has a supervision line item, the owner is paying twice.

General conditions is a major negotiation lever. A 2% reduction on a $30M budget saves $600K -- more than most change order negotiations.

### Step 4: Change Order Management Template

| CO # | Date | Description | Trade | Proposed ($) | Approved ($) | Schedule Impact (Days) | Status | Cumulative CO Total |
|---|---|---|---|---|---|---|---|---|

**Authorization thresholds** (sized to project):
- Field-level: < $[5K-25K] (superintendent approval)
- PM-level: < $[25K-100K] (project manager approval)
- Owner-level: > $[100K] (owner/developer approval required)

**Change order discipline**:
- No work proceeds without written authorization
- All COs must include: scope description, cost breakdown (labor, material, markup), schedule impact, justification
- Track COs against contingency in real time (weekly reporting)
- Distinguish: owner-directed changes, unforeseen conditions, design errors/omissions, regulatory changes

### Step 5: Contingency Tracker

| Item | Original Budget | Draws to Date | Remaining | % Spent | % Project Complete | Status |
|---|---|---|---|---|---|---|
| Owner Contingency | $[5% of hard] | | | | | |
| GC Contingency | $[in GC budget] | | | | | |

**Escalation trigger**: if >50% contingency spent at <75% project completion, escalate to owner/developer for review and potential remediation.

**Critical distinction**: owner contingency and GC contingency must be separate with different approval authorities. If the GC controls a large contingency, it will be spent. This is a foundational principle of institutional construction management.

Require weekly contingency reporting, not quarterly. By the time quarterly reports surface a problem, the project is already in trouble.

### Step 6: Payment Application Checklist

Review framework for monthly GC payment applications:

**Pre-approval checks**:
- [ ] Schedule of values reconciliation (amounts match contracted SOV)
- [ ] Work-in-place verification (percent complete matches field observation)
- [ ] Stored materials verification (on-site or bonded off-site, with documentation)
- [ ] Retainage calculation (10% through substantial completion, reducible to 5% after 50%)
- [ ] Subcontractor lien waivers (conditional for current pay app, unconditional for prior)
- [ ] Change order incorporation (approved COs reflected in updated SOV)
- [ ] Insurance certificate current
- [ ] Compliance documentation (prevailing wage certified payroll, if applicable)

**Final payment / closeout**:
- [ ] Substantial completion certificate issued
- [ ] Punch list completed and signed off
- [ ] As-built drawings delivered
- [ ] O&M manuals and warranty documentation
- [ ] Final unconditional lien waivers from all subs and suppliers
- [ ] Certificate of occupancy obtained
- [ ] Retainage release (after lien waiver period, typically 30-60 days)

## Output Format

| Section | Content |
|---|---|
| A | Hard Cost Benchmark Comparison (CSI division table with variance flags) |
| B | Contract Structure Comparison (GMP vs. cost-plus vs. stipulated sum with recommendation) |
| C | GC Fee & General Conditions Analysis (component-level with double-counting flags) |
| D | Change Order Management Template (CO log + authorization thresholds) |
| E | Contingency Tracker (owner vs. GC contingency with escalation triggers) |
| F | Payment Application Checklist (pre-approval + closeout) |

## Red Flags & Failure Modes

1. **Accepting a GC budget at face value**: every GC budget embeds margin across line items beyond the stated fee. Line-by-line benchmarking against CSI division costs reveals the total embedded margin.
2. **Choosing contract type by habit**: GMP is not always best. Cost-plus works for uncertain scope; stipulated sum for repetitive projects. Match contract to project risk profile.
3. **GC controlling both contingency and approval authority**: if the GC can draw on contingency without owner sign-off, the contingency becomes GC profit. Separate owner and GC contingency with distinct approval chains.
4. **Ignoring general conditions as a negotiation lever**: general conditions (6-12% of hard costs) often yield more savings than fighting individual change orders. Negotiate the percentage and review inclusions carefully.
5. **Quarterly contingency reporting instead of weekly**: by the time a quarterly report reveals contingency overrun, the project is already in trouble. Weekly tracking enables early intervention.
6. **Comparing GC bids without normalizing scope**: GCs price exclusions and allowances differently. A lower headline number may exclude scope that another GC includes. Normalize to identical scope before comparing.

## Chain Notes

- **Downstream**: dev-proforma-engine (validated hard cost budget feeds TDC)
- **Upstream**: land-residual-hbu-analyzer (product type and density drive construction type selection)
- **Related**: entitlement-feasibility (entitlement conditions like affordable units may add hard cost line items)

Related Skills

tenant-credit-analyzer

6
from mariourquia/cre-skills-plugin

Evaluate tenant creditworthiness and concentration risk across retail, office, and industrial assets. Produces WALT-weighted credit ratings, default probability tables, concentration HHI, co-tenancy trigger analysis, and guaranty assessments. Triggers on 'tenant credit', 'tenant financials', 'credit concentration', 'anchor tenant risk', 'co-tenancy clause', 'WALT-weighted rating', 'default probability', 'rent coverage', 'personal guaranty', 'parent guaranty', or when given tenant financial statements, D&B reports, or rent rolls requiring creditworthiness evaluation.

Construction Meeting Prep and Action Tracking

6
from mariourquia/cre-skills-plugin

Prepares weekly or biweekly construction-meeting packets (agenda, data summary, RFI and submittal log, COs, schedule status, safety) and tracks action items with owners and due dates. Closes the loop by updating status and surfacing stale items.

Annual Budget Build

6
from mariourquia/cre-skills-plugin

Builds the annual operating budget from property-level bottoms-up plus portfolio-level assumptions. Revenue build from rent roll + market reference + renewal policy; expense build from assumption libraries + staffing ratios + benchmarks. Produces variance narrative against prior year and T12, stress-test sensitivities, and a draft owner package. Final submission is gated.

Estimator / Preconstruction Lead (Residential Multifamily)

6
from mariourquia/cre-skills-plugin

Preconstruction and estimating lead. Produces estimates at conceptual, schematic, design-development, construction-documents, and GMP stages for ground-up and renovation scope. Owns the reconciliation between proposed scopes and the reference library (material costs, labor rates, assembly costs, unit turn cost library, capex line-item library, renovation scope library). Drives bid tabulation and trade-buyout leveling. Does not approve awards; supplies the decision basis.

Construction Manager (Residential Multifamily)

6
from mariourquia/cre-skills-plugin

Owner-side construction execution leader during vertical construction and major renovations. Owns day-to-day coordination with the GC, schedule discipline, RFI and submittal flow, safety oversight, and punch-list closeout. Reports to development_manager during ground-up projects and to asset_manager during value-add renovations.

rent-roll-analyzer

6
from mariourquia/cre-skills-plugin

Ingests raw rent rolls (pasted table, CSV, or PDF extract) and produces a clean dataset with layered analytics: rollover schedule, mark-to-market waterfall, tenant concentration risk, WALT, rent benchmarking, MTM exposure, and data quality flags. Triggers on 'analyze this rent roll', 'clean up this rent roll', or when rent roll data needs preprocessing before underwriting.

refi-decision-analyzer

6
from mariourquia/cre-skills-plugin

Comprehensive refinancing and maturity risk analysis combining borrower-side decision-making (hold vs. refi vs. sell vs. extend vs. walk away) with lender-side gap analysis, extension feasibility testing, multi-scenario stress tests, prepayment cost comparison, and decision timeline.

property-tax-appeal-analyzer

6
from mariourquia/cre-skills-plugin

Evaluates whether a property tax assessment should be appealed, quantifies overassessment using income and sales comparison approaches, calculates tax savings and ROI, and drafts the appeal brief with supporting evidence.

pca-reserve-analyzer

6
from mariourquia/cre-skills-plugin

Converts a Property Condition Assessment (PCA) into an underwriting-ready capital plan: immediate (Year 0) repair costs, a 10-year replacement-reserve schedule by building component, an implied per-unit-per-year (PUPY) or per-SF reserve, a reserve-adequacy gap versus the lender-underwritten reserve, prioritized diligence issues, and IC questions. Triggers on 'PCA', 'property condition assessment', 'replacement reserve', 'reserve adequacy', 'PNA', or when a property condition report needs to be turned into capital numbers.

lease-trade-out-analyzer

6
from mariourquia/cre-skills-plugin

Analyzes whether to renew an existing tenant or trade out for a new one with full financial comparison. Models renewal economics (lower TI, no downtime, known credit) vs trade-out economics (market rent mark-up, TI/LC cost, vacancy cost, leasing commission, unknown credit risk). Produces NPV comparison with breakeven analysis.

lease-negotiation-analyzer

6
from mariourquia/cre-skills-plugin

Consolidates 8 complex lease negotiation scenarios into a single skill with scenario selector: (a) anchor replacement with co-tenancy cascade, (b) trophy tower backfill, (c) naming rights valuation, (d) life science TI amortization, (e) sublease consent with recapture NPV, (f) exclusive use violation, (g) specialty conversion IRR crossover, (h) ground lease improvements. Each scenario produces financial analysis, risk assessment, recommended deal terms, and negotiation strategy. Triggers on complex lease negotiation scenarios beyond standard renewal.

land-residual-hbu-analyzer

6
from mariourquia/cre-skills-plugin

Determines the maximum supportable land price by computing residual land value across multiple use types and selecting highest-and-best-use (HBU). Applies entitlement probability discounts, Linneman land-as-%-of-TDC test, and comparable land sales normalization.