multiAI Summary Pending
Solar Installation Business Operations
Complete operational knowledge base for residential and commercial solar installation companies. Covers system design, permitting, sales, installation management, financing, and growth.
3,556 stars
byopenclaw
Installation
Claude Code / Cursor / Codex
$curl -o ~/.claude/skills/afrexai-solar-installer/SKILL.md --create-dirs "https://raw.githubusercontent.com/openclaw/skills/main/skills/1kalin/afrexai-solar-installer/SKILL.md"
Manual Installation
- Download SKILL.md from GitHub
- Place it in
.claude/skills/afrexai-solar-installer/SKILL.mdinside your project - Restart your AI agent — it will auto-discover the skill
How Solar Installation Business Operations Compares
| Feature / Agent | Solar Installation Business Operations | Standard Approach |
|---|---|---|
| Platform Support | multi | Limited / Varies |
| Context Awareness | High | Baseline |
| Installation Complexity | Unknown | N/A |
Frequently Asked Questions
What does this skill do?
Complete operational knowledge base for residential and commercial solar installation companies. Covers system design, permitting, sales, installation management, financing, and growth.
Which AI agents support this skill?
This skill is compatible with multi.
Where can I find the source code?
You can find the source code on GitHub using the link provided at the top of the page.
SKILL.md Source
# Solar Installation Business Operations Complete operational knowledge base for residential and commercial solar installation companies. Covers system design, permitting, sales, installation management, financing, and growth. ## Industry Overview - US residential solar market: $30B+ annually, 700K+ installations/year - Average residential system: 8-12 kW, $2.50-$3.50/watt installed - 30% federal ITC (Investment Tax Credit) through 2032 - 12,000+ solar installers in the US - Growth rate: 20-25% annually ## System Design & Engineering ### Residential Systems - Site assessment: roof age, orientation, shading analysis (Aurora Solar, Helioscope) - Panel selection: monocrystalline (21-23% efficiency) vs polycrystalline (17-19%) - Inverter types: string ($1,000-2,000), microinverters ($150-250/panel), power optimizers ($50-80/panel) - Battery storage: Tesla Powerwall ($12,000-16,000), Enphase IQ ($15,000-20,000) - System sizing: annual kWh usage / (365 × peak sun hours × system efficiency 0.78) - Design software: Aurora Solar ($250-500/mo), Helioscope ($200/mo), OpenSolar (free tier) ### Commercial Systems - Flat roof: ballasted racking, 10-15 degree tilt - Typical size: 50-500 kW - PPA structures: $0.08-0.14/kWh, 20-25 year terms - Interconnection: utility coordination, net metering vs feed-in tariff - Demand charge reduction: pair with battery for peak shaving ## Permitting & Compliance ### Federal - ITC: 30% tax credit (residential + commercial through 2032) - Adders: +10% domestic content, +10% energy community, +20% low-income - IRS Form 5695 (residential), Form 3468 (commercial) ### State & Local - Permits required: electrical, building, sometimes structural - AHJ (Authority Having Jurisdiction) varies by municipality - Typical permit cost: $200-$1,500 - Plan sets: site plan, electrical single-line diagram, structural attachment details - SRECs (Solar Renewable Energy Credits): varies by state ($10-$400/MWh) - Net metering policies: state-specific, track NEM 3.0 changes ### Interconnection - Utility application: pre-construction approval required - PTO (Permission to Operate): final utility sign-off, 2-8 weeks typical - Meter upgrade may be needed for systems >10 kW ## Sales & Customer Acquisition ### Lead Sources - Door-to-door: $0.50-2.00/door knocked, 1-3% close rate - Digital marketing: $50-200 per qualified lead - Referrals: lowest cost ($0-500 incentive), highest close rate (40-60%) - Partnerships: roofers, realtors, home builders - Lead buying: $20-80/lead (shared), $100-300/lead (exclusive) ### Sales Process 1. Initial consultation (15-30 min phone/video) 2. Site survey (drone or in-person, shade analysis) 3. Custom proposal: energy offset, savings projection, financing options 4. Contract signing: include change order process, warranty terms 5. Typical sales cycle: 2-6 weeks residential, 2-6 months commercial ### Proposal Software - Aurora Solar (design + proposal), Enerflo, Solo, Sunbase - Include: system size, production estimate, 25-year savings, financing comparison - Always show: cash purchase vs loan vs lease vs PPA side-by-side ### Pricing Strategy - Cost-plus: total cost + 20-35% margin - Market-based: competitive analysis by zip code - Average residential gross margin: 25-35% - Average commercial gross margin: 15-25% - Adders: battery (+$10K-20K), panel upgrade (+$0.10-0.30/W), critter guard ($500-1,500) ## Financing ### Residential Options - Cash purchase: highest ROI, 6-10 year payback - Solar loan: $0 down, 12-25 year terms, 4-9% APR (GoodLeap, Mosaic, Sunlight Financial) - Lease: customer pays fixed monthly, no ownership - PPA: pay per kWh generated, no upfront cost - Dealer fees: 15-30% of project cost (baked into loan rate) ### Commercial Options - PPA: most common, off-balance-sheet - Capital lease: ownership at end of term - PACE (Property Assessed Clean Energy): repaid through property tax - MACRS depreciation: 5-year accelerated + bonus depreciation ## Installation Operations ### Crew Structure - Install crew: 3-4 people per residential job (1 lead installer, 2-3 helpers) - Electrician: licensed, for panel/inverter/meter work - Target: 1-2 residential installs per crew per day ### Installation Timeline (Residential) 1. Permitting: 1-4 weeks 2. Equipment procurement: 1-2 weeks 3. Roof install: 1-2 days 4. Electrical: 0.5-1 day 5. Inspection: 1-2 weeks 6. PTO: 2-8 weeks - Total contract-to-PTO: 6-16 weeks ### Equipment & Inventory - Keep 2-4 weeks of panel inventory - Racking: IronRidge, Unirac, SnapNrack - BOS (Balance of System): conduit, wire, disconnects, monitoring - Fleet: box trucks or trailers with roof racks ### Quality & Warranty - Workmanship warranty: 10-25 years (industry standard) - Panel warranty: 25-30 years (manufacturer) - Inverter warranty: 12-25 years - Document everything: photos before/during/after, torque specs, wire labels ## Team & Compensation ### Key Roles - Sales reps: $60K-120K OTE (base + commission 5-10% of contract) - Install lead: $55K-80K + performance bonus - Installer helper: $35K-55K - Project coordinator: $45K-65K - Electrician: $60K-90K (or subcontracted $75-150/hr) - Design engineer: $55K-85K ### Certifications - NABCEP PV Installation Professional: gold standard, increases close rate - OSHA 10/30: required for job sites - State electrical license: required for electricians - Manufacturer certifications: Tesla Powerwall, Enphase, SolarEdge ## Financial Benchmarks ### Revenue Per Install - Residential: $25,000-$50,000 - Commercial: $100,000-$2,000,000+ - Battery add-on: $10,000-$25,000 ### Cost Structure (Residential) - Panels: 25-30% of project cost - Inverter/BOS: 10-15% - Labor: 10-15% - Permitting/interconnection: 3-5% - Sales/marketing: 15-25% - Overhead/G&A: 10-15% - Net margin (healthy): 8-15% ### Key Metrics - Cost per watt installed: track monthly - Customer acquisition cost (CAC): target <$3,000 - Install time per kW: benchmark efficiency - PTO timeline: track bottlenecks - Net Promoter Score: target 60+ - Referral rate: target 30%+ ## Growth Playbook ### Phase 1: Foundation (0-50 installs/year) - Focus on residential in 1-2 markets - Build referral network: roofers, electricians, realtors - Nail the install process before scaling - Get NABCEP certified ### Phase 2: Scale (50-200 installs/year) - Add dedicated sales team - Digital marketing: Google Ads, solar review sites - Subcontractor network for overflow - Add battery storage as standard offering ### Phase 3: Expansion (200-500 installs/year) - Enter commercial market - Multiple crews running simultaneously - In-house design and engineering team - Regional expansion or franchise model ### Phase 4: Market Leader (500+ installs/year) - EPC for commercial/utility scale - O&M (Operations & Maintenance) recurring revenue - White-label installer for national brands - Energy storage and EV charging integration ## Common Pitfalls - Underestimating permitting timelines (varies wildly by AHJ) - Over-reliance on dealer fee financing (margin erosion) - Not tracking cost-per-watt by project (can't optimize what you don't measure) - Ignoring roof condition (warranty liability if roof fails) - Poor change order management (scope creep kills margins) - Not building recurring revenue (O&M, monitoring, battery upgrades) --- ## Resources Build your AI-powered solar business operations: - [AI Agent Context Packs](https://afrexai-cto.github.io/context-packs/) — Industry-specific AI agent configurations ($47/pack) - [AI Revenue Leak Calculator](https://afrexai-cto.github.io/ai-revenue-calculator/) — Find where your solar business is losing money to manual processes - [Agent Setup Wizard](https://afrexai-cto.github.io/agent-setup/) — Deploy AI agents for your solar company in minutes Built by [AfrexAI](https://afrexai-cto.github.io/context-packs/) — AI Data Automations