change-management
Skill for engineering change request and order processing through PLM systems
Best use case
change-management is best used when you need a repeatable AI agent workflow instead of a one-off prompt.
Skill for engineering change request and order processing through PLM systems
Teams using change-management should expect a more consistent output, faster repeated execution, less prompt rewriting.
When to use this skill
- You want a reusable workflow that can be run more than once with consistent structure.
When not to use this skill
- You only need a quick one-off answer and do not need a reusable workflow.
- You cannot install or maintain the underlying files, dependencies, or repository context.
Installation
Claude Code / Cursor / Codex
Manual Installation
- Download SKILL.md from GitHub
- Place it in
.claude/skills/change-management/SKILL.mdinside your project - Restart your AI agent — it will auto-discover the skill
How change-management Compares
| Feature / Agent | change-management | Standard Approach |
|---|---|---|
| Platform Support | Not specified | Limited / Varies |
| Context Awareness | High | Baseline |
| Installation Complexity | Unknown | N/A |
Frequently Asked Questions
What does this skill do?
Skill for engineering change request and order processing through PLM systems
Where can I find the source code?
You can find the source code on GitHub using the link provided at the top of the page.
SKILL.md Source
# Engineering Change Management Skill
## Purpose
The Engineering Change Management skill provides capabilities for managing engineering changes through PLM systems, ensuring controlled modification of designs with proper impact assessment and approval workflow.
## Capabilities
- ECR/ECO workflow initiation
- Impact assessment guidance
- Affected item identification
- Approval routing configuration
- Effectivity management
- Documentation update tracking
- Interchangeability analysis
- Configuration management
## Usage Guidelines
### Change Management Framework
#### Change Types
| Type | Description | Urgency | Approval Level |
|------|-------------|---------|----------------|
| Class I | Form/fit/function change | Normal | Full review |
| Class II | Minor change, no F/F/F impact | Normal | Limited review |
| Deviation | Temporary non-conformance | Varies | Engineering |
| Waiver | Accept as-is before build | Varies | Engineering |
| Emergency | Safety/production critical | Urgent | Expedited |
#### Change Process Flow
```
1. Change Request (ECR)
- Problem/opportunity identification
- Preliminary impact assessment
- Initial approval to investigate
2. Change Investigation
- Detailed impact analysis
- Solution development
- Cost/schedule estimation
3. Change Order (ECO)
- Formal change documentation
- Approval routing
- Implementation planning
4. Implementation
- Document updates
- Manufacturing notification
- Effectivity management
5. Closure
- Verification of implementation
- Record completion
```
### Engineering Change Request (ECR)
#### ECR Content
```
Required information:
- Problem statement
- Proposed solution (if known)
- Originator and date
- Affected items (preliminary)
- Impact assessment (preliminary)
- Priority/urgency
- Supporting documentation
```
#### Impact Categories
| Category | Assessment Questions |
|----------|---------------------|
| Technical | Does it affect performance, reliability, safety? |
| Cost | What is development and recurring cost impact? |
| Schedule | What is timeline impact? |
| Manufacturing | Does it affect tooling, processes, suppliers? |
| Service | Does it affect spare parts, maintenance procedures? |
| Regulatory | Does it affect certifications, approvals? |
### Engineering Change Order (ECO)
#### ECO Content
```
Required sections:
1. Change description
- What is changing
- Why change is needed
- How change will be implemented
2. Affected items list
- Part numbers
- Document numbers
- Revision levels (from/to)
3. Impact assessment
- By category (cost, schedule, technical)
- Risk assessment
4. Interchangeability
- Form/fit/function analysis
- Backward compatibility
5. Effectivity
- Serial number/date effectivity
- Retrofit requirements
6. Implementation plan
- Tasks and responsibilities
- Timeline
- Verification requirements
```
### Interchangeability Analysis
#### Interchangeability Codes
| Code | Meaning | Action |
|------|---------|--------|
| D | Direct interchangeable | Replace anywhere |
| O | One-way interchangeable | New replaces old only |
| N | Not interchangeable | Separate part number |
| R | Retrofittable | Can upgrade old units |
#### Assessment Criteria
```
Form:
- Dimensions unchanged?
- Mounting unchanged?
- Interfaces unchanged?
Fit:
- Assembly process unchanged?
- Mating parts unaffected?
- Clearances maintained?
Function:
- Performance unchanged?
- Reliability maintained?
- Safety unaffected?
```
### Approval Workflow
#### Standard Routing
```
Typical approval levels:
1. Originator - Complete ECR/ECO
2. Design Engineering - Technical review
3. Analysis Engineering - Impact verification
4. Manufacturing Engineering - Process review
5. Quality Assurance - Compliance review
6. Program Management - Cost/schedule review
7. Configuration Management - Release authority
8. Customer (if required) - Acceptance
```
#### Approval Criteria
| Role | Focus Areas |
|------|-------------|
| Design Engineering | Technical correctness |
| Manufacturing | Producibility, tooling |
| Quality | Inspection, compliance |
| Supply Chain | Supplier impact, cost |
| Program Management | Schedule, budget |
| Customer | Contract compliance |
### Effectivity Management
#### Effectivity Types
```
Serial number effectivity:
- Starting serial: S/N 100
- Ending serial: S/N 199 (or blank for ongoing)
Date effectivity:
- Effective date: 2026-02-01
Lot effectivity:
- Starting lot: LOT-2026-001
```
#### Implementation Planning
```
Implementation considerations:
- Work-in-process inventory
- Finished goods inventory
- Field units
- Spare parts inventory
- Documentation updates
- Training requirements
```
### Documentation Updates
#### Affected Document Types
| Type | Update Required | Responsibility |
|------|-----------------|----------------|
| Drawings | New revision | Design |
| Models | New revision | Design |
| Specifications | As needed | Engineering |
| Procedures | As needed | Manufacturing |
| Manuals | As needed | Publications |
| Training | As needed | Training |
## Process Integration
- ME-025: Engineering Change Management
## Input Schema
```json
{
"change_type": "ECR|ECO|deviation|waiver",
"problem_statement": "string",
"proposed_solution": "string",
"affected_items": [
{
"item_number": "string",
"current_revision": "string",
"item_type": "part|document|process"
}
],
"priority": "normal|urgent|emergency",
"originator": "string",
"supporting_documents": "array of references"
}
```
## Output Schema
```json
{
"change_document": {
"number": "string",
"type": "ECR|ECO",
"status": "draft|in_review|approved|implemented|closed"
},
"impact_assessment": {
"technical": "string",
"cost": "number",
"schedule": "string",
"manufacturing": "string"
},
"interchangeability": {
"code": "D|O|N|R",
"justification": "string"
},
"approval_routing": {
"current_step": "string",
"approvers": "array",
"target_completion": "date"
},
"implementation_plan": {
"tasks": "array",
"effectivity": "object",
"verification_method": "string"
}
}
```
## Best Practices
1. Document problem clearly before proposing solution
2. Assess all impact categories thoroughly
3. Identify all affected items before approval
4. Define clear effectivity for implementation
5. Update all affected documentation
6. Verify implementation before closure
## Integration Points
- Connects with Design Review for change evaluation
- Feeds into Requirements Flowdown for traceability
- Supports Configuration Management for control
- Integrates with Quality for complianceRelated Skills
translation-management
Integration with translation management systems and i18n workflows. Connect with Crowdin, Transifex, Weblate, manage translation memory, synchronize glossaries, and automate localization pipelines.
key-management-orchestrator
Cryptographic key lifecycle management orchestration including generation, rotation, and destruction across key management systems
changelog-generator
Automated changelog generation from commits and PRs
ip-core-management
Vendor IP core configuration and integration expertise for FPGA designs
donor-relationship-management
Cultivate and steward donor relationships including prospect research, personalized engagement strategies, gift acknowledgment, and impact reporting
ligand-exchange-protocol-manager
Surface chemistry skill for managing ligand exchange reactions, bioconjugation protocols, and functional group quantification
heat-exchanger-design
Specialized skill for heat exchanger sizing, rating, and optimization per TEMA standards including shell-and-tube, plate, and air-cooled configurations
stormwater-management
Skill for integrated stormwater management and green infrastructure design with SWMM modeling, hydrologic analysis, BMP sizing, and MS4 permit compliance.
thermal-management
Vehicle and powertrain thermal management system design
influencer-kol-management
Industry influencer and key opinion leader relationship management
crisis-management-platform
Crisis response platform integration and real-time monitoring
change-request-analyzer
Analyze change request impacts on scope, schedule, and cost