Change Order Review

Reviews each proposed change order: validates scope basis, re-estimates cost, checks schedule impact, evaluates against contingency, recommends approval or rejection, and routes to the correct approval row by dollar threshold. Tracks `change_orders_pct_of_contract` and `contingency_burn_rate`.

6 stars

Best use case

Change Order Review is best used when you need a repeatable AI agent workflow instead of a one-off prompt.

Reviews each proposed change order: validates scope basis, re-estimates cost, checks schedule impact, evaluates against contingency, recommends approval or rejection, and routes to the correct approval row by dollar threshold. Tracks `change_orders_pct_of_contract` and `contingency_burn_rate`.

Teams using Change Order Review should expect a more consistent output, faster repeated execution, less prompt rewriting.

When to use this skill

  • You want a reusable workflow that can be run more than once with consistent structure.

When not to use this skill

  • You only need a quick one-off answer and do not need a reusable workflow.
  • You cannot install or maintain the underlying files, dependencies, or repository context.

Installation

Claude Code / Cursor / Codex

$curl -o ~/.claude/skills/change_order_review/SKILL.md --create-dirs "https://raw.githubusercontent.com/mariourquia/cre-skills-plugin/main/src/skills/residential_multifamily/workflows/change_order_review/SKILL.md"

Manual Installation

  1. Download SKILL.md from GitHub
  2. Place it in .claude/skills/change_order_review/SKILL.md inside your project
  3. Restart your AI agent — it will auto-discover the skill

How Change Order Review Compares

Feature / AgentChange Order ReviewStandard Approach
Platform SupportNot specifiedLimited / Varies
Context Awareness High Baseline
Installation ComplexityUnknownN/A

Frequently Asked Questions

What does this skill do?

Reviews each proposed change order: validates scope basis, re-estimates cost, checks schedule impact, evaluates against contingency, recommends approval or rejection, and routes to the correct approval row by dollar threshold. Tracks `change_orders_pct_of_contract` and `contingency_burn_rate`.

Where can I find the source code?

You can find the source code on GitHub using the link provided at the top of the page.

SKILL.md Source

# Change Order Review

## Workflow purpose

Convert a change order request into an informed decision with a cost, schedule, and contingency view. Route to the correct approval row. Keep the change-order trail clean for draw review and cost-to-complete.

## Trigger conditions

- **Explicit:** "review change order", "CO evaluation", "PCO review".
- **Implicit:** GC submits a PCO; owner requests scope change; RFI produces a cost impact.
- **Recurring:** as each CO arrives.

## Inputs (required / optional)

| Input | Type | Required | Notes |
|---|---|---|---|
| CO package | doc | required | narrative, line items, schedule |
| Original scope and contract | doc | required | basis |
| Prior COs | table | required | cumulative view |
| Estimator baseline | estimate | required | for re-estimate |
| Schedule record | record | required | for impact |
| Contingency status | derived | required | `contingency_remaining`, burn rate |

## Outputs

| Output | Type | Shape |
|---|---|---|
| CO review memo | `memo` | scope, cost, schedule, contingency impact, recommendation |
| Updated contract value | record | with CO pending or approved state |
| Updated schedule | record | milestone impacts |
| Approval request | request | row 10 or 11 |

## Required context

Asset_class, segment, form_factor, market, project.

## Process

1. **Scope validation.** Compare CO narrative to original contract and current scope; identify whether the change is scope add, deduct, credit, or clarification.
2. **Re-estimate.** Apply library, labor, and material references; compare to GC's proposed cost.
3. **Schedule impact.** Evaluate milestone impacts; compute `schedule_variance_days` delta.
4. **Contingency impact.** Compute `contingency_remaining` and `contingency_burn_rate` after CO. If burn exceeds overlay band, flag.
5. **Decision recommendation.** Approve / negotiate / reject based on scope rationale and cost variance.
6. **Approval routing.** Row 10 for minor; row 11 for major. Thresholds overlay-driven.
7. **Safety-critical scope change.** If change defers or modifies life-safety scope, row 4 also applies.
8. **Documentation.** Update contract register, schedule register, change-order log.
9. **Confidence banner.** References surfaced.

## Metrics used

`change_orders_pct_of_contract`, `contingency_remaining`, `contingency_burn_rate`, `cost_to_complete`, `schedule_variance_days`.

## Reference files used

- `reference/normalized/capex_line_items__{scope}.csv`
- `reference/normalized/labor_rates__{market}.csv`
- `reference/normalized/material_costs__{region}_residential.csv`
- `reference/derived/contingency_assumptions__{org}.csv`
- `reference/normalized/approval_threshold_defaults.csv`

## Escalation points

- Minor CO: row 10.
- Major CO: row 11.
- Safety-scope deferral: row 4.

## Required approvals

- Minor change order (row 10).
- Major change order (row 11).

## Failure modes

1. Approving without re-estimate. Fix: re-estimate mandatory.
2. Missing schedule impact. Fix: schedule impact mandatory.
3. Approving without contingency view. Fix: contingency impact mandatory.
4. Treating scope clarification as added cost. Fix: scope validation classifies.
5. Safety-scope deferral silent. Fix: row 4 gate.

## Edge cases

- **Owner-initiated change:** track separately; may be funded outside project budget per overlay.
- **Differing site condition:** overlay may require third-party verification before approval.
- **Credit CO:** ensure credit flows to owner; not netted silently.
- **Chain of COs from one RFI:** aggregate for approval level.

## Example invocations

1. "Review the PCO submitted for Ashford Park amenity refresh."
2. "CO log for the Willow Creek renovation program — anything trending hot?"
3. "Evaluate this scope change request on Riverbend construction."

## Example outputs

### Output — CO review (abridged, amenity refresh PCO)

**Scope.** Scope add per owner direction; library mapping present.

**Re-estimate.** Cost within overlay range of GC proposal; negotiation lever identified in one line.

**Schedule.** No critical path impact; `schedule_variance_days` unchanged.

**Contingency.** `contingency_remaining` after CO within overlay band; `contingency_burn_rate` within tolerance.

**Recommendation.** Approve at negotiated line adjustment; `approval_request` row 10 opened.

**Confidence banner.** `capex_line_items__amenity@2026-03-31, status=starter`. `contingency_assumptions@2026-03-31, status=starter`.

Related Skills

Work Order Triage

6
from mariourquia/cre-skills-plugin

Classifies work order urgency from free-text descriptions, assigns priority (P1-P4) with SLA deadlines, estimates cost, checks lease responsibility, and routes to the correct approval path.

title-commitment-reviewer

6
from mariourquia/cre-skills-plugin

Analyze ALTA title commitments, surveys, and Schedule B exceptions for CRE acquisitions. Identifies title defects, chain breaks, lien conflicts, and cure requirements. Triggers on 'title commitment', 'Schedule B exceptions', 'title review', 'title exceptions', 'encumbrances', 'survey cross-reference', 'title chain', 'mechanic's lien', 'title cure', or when given a title commitment document, survey, or lien search results.

Vendor Dispatch and SLA Review

6
from mariourquia/cre-skills-plugin

Weekly and quarterly review of dispatch SLA adherence and vendor performance. Produces a vendor scorecard per market and trade, flags underperformers, verifies insurance and licensure freshness, and proposes rotation actions. Vendor contract changes are routed for approval.

Third-Party Manager Scorecard Review

6
from mariourquia/cre-skills-plugin

Owner-oversight review of third-party property manager performance. Scores against the PMA's service standards and the overlay's rubric, computes adherence metrics, flags audit findings, produces the scorecard memo and the TPM-facing communication draft. Runs monthly per property and quarterly per PMA. Material performance gaps and any PMA amendment or termination are gated.

Schedule Risk Review

6
from mariourquia/cre-skills-plugin

Reviews current schedule against baseline, identifies critical-path risks, recomputes completion and stabilization probability, and routes a rebaseline proposal when warranted. Integrates with `workflows/cost_to_complete_review` and `workflows/draw_package_review` for financial consequences.

Quarterly Portfolio Review

6
from mariourquia/cre-skills-plugin

Portfolio-level quarterly review covering same-store trend, market concentration, watchlist distribution, capex progress, lease-up status, forecast discipline, covenant posture, and fund-level context. Produces the board and investor narrative drafts.

Pipeline Review

6
from mariourquia/cre-skills-plugin

Weekly review of every deal in the pipeline by stage (sourcing, loi_signed, psa_signed, ic_approved, debt_term_sheet, close, funded). Produces a stage-by-stage scorecard, flags stalled deals beyond the overlay-defined aging threshold, surfaces IC-prep load and debt-term-sheet variance, and quantifies retrade risk. Dealpath is the primary source; the workflow surfaces any `dp_completeness_ic_record` or `dp_handoff_lag` blocker from adapter dq rules before any roll-up claim is made.

Monthly Property Operating Review

6
from mariourquia/cre-skills-plugin

Monthly property scorecard and narrative. Synthesizes operating, leasing, collections, maintenance, and financial variance into a single review pack for the PM, regional, and AM. Invokes child workflows for funnel, delinquency, turn, and WO views.

Monthly Asset Management Review

6
from mariourquia/cre-skills-plugin

Ownership-side monthly review. Synthesizes property-level operating output into asset plan reality check: variance to budget and reforecast, covenant view with cushion and breach risk, watchlist scoring, rent-growth and trade-out, capex progress and yield, stabilization pace for lease-up, same-store rollup. Produces the AM agenda for PM and regional conversations, the lender compliance scaffold, and the investor-facing draft.

Lead-to-Lease Funnel Review

6
from mariourquia/cre-skills-plugin

Diagnostic review of the leasing funnel from lead through move-in. Identifies where the funnel is breaking (response time, tour conversion, application conversion, approval, move-in), quantifies exposure, surfaces fair-housing and screening-drift flags, and proposes a remediation plan with owner-specific target bands. Recurring weekly at the property level; invoked ad hoc when notice exposure or leased occupancy slips.

Draw Package Review

6
from mariourquia/cre-skills-plugin

Reviews a draw package end to end before lender submission. Validates construction cost to date, reconciles to the lender requisition, confirms lien waivers by vendor and period, verifies insurance endorsements, checks compliance attestations, and evaluates cost-to-complete. Splits construction manager and asset manager responsibilities. Opens approval gates for construction manager (row 12) and, finally, for the lender submission (row 14). Final submission never goes out without approved records.

Cost-to-Complete Review

6
from mariourquia/cre-skills-plugin

Recomputes cost-to-complete from current actuals plus remaining scope plus overlay-derived escalation and contingency. Compares against prior CTC and the underwriting baseline. Identifies the driver (labor, material, scope, duration) and recommends remediation (re-estimate, scope trim, re-bid, contingency pull).