Schedule Risk Review
Reviews current schedule against baseline, identifies critical-path risks, recomputes completion and stabilization probability, and routes a rebaseline proposal when warranted. Integrates with `workflows/cost_to_complete_review` and `workflows/draw_package_review` for financial consequences.
Best use case
Schedule Risk Review is best used when you need a repeatable AI agent workflow instead of a one-off prompt.
Reviews current schedule against baseline, identifies critical-path risks, recomputes completion and stabilization probability, and routes a rebaseline proposal when warranted. Integrates with `workflows/cost_to_complete_review` and `workflows/draw_package_review` for financial consequences.
Teams using Schedule Risk Review should expect a more consistent output, faster repeated execution, less prompt rewriting.
When to use this skill
- You want a reusable workflow that can be run more than once with consistent structure.
When not to use this skill
- You only need a quick one-off answer and do not need a reusable workflow.
- You cannot install or maintain the underlying files, dependencies, or repository context.
Installation
Claude Code / Cursor / Codex
Manual Installation
- Download SKILL.md from GitHub
- Place it in
.claude/skills/schedule_risk_review/SKILL.mdinside your project - Restart your AI agent — it will auto-discover the skill
How Schedule Risk Review Compares
| Feature / Agent | Schedule Risk Review | Standard Approach |
|---|---|---|
| Platform Support | Not specified | Limited / Varies |
| Context Awareness | High | Baseline |
| Installation Complexity | Unknown | N/A |
Frequently Asked Questions
What does this skill do?
Reviews current schedule against baseline, identifies critical-path risks, recomputes completion and stabilization probability, and routes a rebaseline proposal when warranted. Integrates with `workflows/cost_to_complete_review` and `workflows/draw_package_review` for financial consequences.
Where can I find the source code?
You can find the source code on GitHub using the link provided at the top of the page.
SKILL.md Source
# Schedule Risk Review
## Workflow purpose
Keep the project schedule honest. Measure slip, name the cause, quantify the cost and lease-up downstream impact, and route any rebaseline.
## Trigger conditions
- **Explicit:** "run schedule risk", "what's the slip", "rebaseline proposal".
- **Implicit:** milestone slipped vs. baseline; critical-path disruption; weather delay beyond overlay tolerance; lease-up pace approaching stabilization deadline.
- **Recurring:** monthly per active project.
## Inputs (required / optional)
| Input | Type | Required | Notes |
|---|---|---|---|
| Current schedule | record | required | |
| Baseline schedule | record | required | |
| Milestone record | table | required | baseline vs. current forecast |
| Critical-path disruption log | log | optional | |
| Duration assumption overlay | csv | required | |
| Lease-up plan (if applicable) | record | optional | |
## Outputs
| Output | Type | Shape |
|---|---|---|
| Schedule delta view | `kpi_review` | `schedule_variance_days`, `milestone_slippage_rate` |
| Critical-path memo | `memo` | cause, cost impact, lease-up impact |
| Rebaseline proposal | `memo` | with approval path |
| Lease-up delivery scenario | `kpi_review` | `lease_up_pace_post_delivery` / `stabilization_pace_vs_plan` |
## Required context
Asset_class, segment, form_factor, market, project.
## Process
1. **Compute schedule delta.** `schedule_variance_days` and `milestone_slippage_rate`.
2. **Classify cause.** Trade delay, material lead time, permit, weather, design, labor, owner decision.
3. **Critical-path analysis.** Determine whether slip is on critical path.
4. **Cost consequence.** Link to `workflows/cost_to_complete_review` (escalation, labor, carry cost).
5. **Lease-up consequence (if applicable).** Link to `lease_up_pace_post_delivery` and `stabilization_pace_vs_plan`.
6. **Rebaseline recommendation.** If slip exceeds overlay threshold, recommend rebaseline; opens `approval_request` per overlay.
7. **Confidence banner.** References surfaced.
## Metrics used
`schedule_variance_days`, `milestone_slippage_rate`, `punchlist_closeout_rate`, `lease_up_pace_post_delivery`, `stabilization_pace_vs_plan`.
## Reference files used
- `reference/normalized/construction_duration_assumptions__{region}.csv`
- `reference/normalized/approval_threshold_defaults.csv`
## Escalation points
- Slip above overlay: CM -> AM -> executive.
- Critical-path disruption: CM + AM approval per overlay.
## Required approvals
- Schedule rebaseline.
## Failure modes
1. Slip view without critical-path analysis. Fix: step is mandatory.
2. Missing cost consequence link. Fix: invokes CTC review.
3. Silent rebaseline. Fix: rebaseline is an approval.
4. Lease-up impact ignored. Fix: lease-up scenario mandatory when applicable.
## Edge cases
- **Permit delay at start:** cascading; document clearly.
- **Weather seasonality:** overlay governs expected delays; variance beyond overlay is the flag.
- **Owner-driven delay (design changes):** attribute to owner; cost exposure view distinct.
- **Subcontractor default mid-project:** significant rebaseline likely; escalate.
## Example invocations
1. "Run schedule risk review for Willow Creek."
2. "What's the critical-path slip on the South End renovation?"
3. "Lease-up impact if framing slips 30 days on Riverbend."
## Example outputs
### Output — Schedule risk (abridged, Willow Creek April)
**Slip.** `schedule_variance_days` within overlay band; `milestone_slippage_rate` within band.
**Cause.** One trade's material lead time on one milestone; non-critical path.
**Cost.** Minor carrying cost; CTC review to confirm.
**Lease-up.** No material change to expected TCO.
**Rebaseline.** Not recommended.
**Confidence banner.** `construction_duration_assumptions__southeast@2026-03-31 (starter)`.Related Skills
title-commitment-reviewer
Analyze ALTA title commitments, surveys, and Schedule B exceptions for CRE acquisitions. Identifies title defects, chain breaks, lien conflicts, and cure requirements. Triggers on 'title commitment', 'Schedule B exceptions', 'title review', 'title exceptions', 'encumbrances', 'survey cross-reference', 'title chain', 'mechanic's lien', 'title cure', or when given a title commitment document, survey, or lien search results.
Vendor Dispatch and SLA Review
Weekly and quarterly review of dispatch SLA adherence and vendor performance. Produces a vendor scorecard per market and trade, flags underperformers, verifies insurance and licensure freshness, and proposes rotation actions. Vendor contract changes are routed for approval.
Third-Party Manager Scorecard Review
Owner-oversight review of third-party property manager performance. Scores against the PMA's service standards and the overlay's rubric, computes adherence metrics, flags audit findings, produces the scorecard memo and the TPM-facing communication draft. Runs monthly per property and quarterly per PMA. Material performance gaps and any PMA amendment or termination are gated.
Quarterly Portfolio Review
Portfolio-level quarterly review covering same-store trend, market concentration, watchlist distribution, capex progress, lease-up status, forecast discipline, covenant posture, and fund-level context. Produces the board and investor narrative drafts.
Pipeline Review
Weekly review of every deal in the pipeline by stage (sourcing, loi_signed, psa_signed, ic_approved, debt_term_sheet, close, funded). Produces a stage-by-stage scorecard, flags stalled deals beyond the overlay-defined aging threshold, surfaces IC-prep load and debt-term-sheet variance, and quantifies retrade risk. Dealpath is the primary source; the workflow surfaces any `dp_completeness_ic_record` or `dp_handoff_lag` blocker from adapter dq rules before any roll-up claim is made.
Monthly Property Operating Review
Monthly property scorecard and narrative. Synthesizes operating, leasing, collections, maintenance, and financial variance into a single review pack for the PM, regional, and AM. Invokes child workflows for funnel, delinquency, turn, and WO views.
Monthly Asset Management Review
Ownership-side monthly review. Synthesizes property-level operating output into asset plan reality check: variance to budget and reforecast, covenant view with cushion and breach risk, watchlist scoring, rent-growth and trade-out, capex progress and yield, stabilization pace for lease-up, same-store rollup. Produces the AM agenda for PM and regional conversations, the lender compliance scaffold, and the investor-facing draft.
Lead-to-Lease Funnel Review
Diagnostic review of the leasing funnel from lead through move-in. Identifies where the funnel is breaking (response time, tour conversion, application conversion, approval, move-in), quantifies exposure, surfaces fair-housing and screening-drift flags, and proposes a remediation plan with owner-specific target bands. Recurring weekly at the property level; invoked ad hoc when notice exposure or leased occupancy slips.
Draw Package Review
Reviews a draw package end to end before lender submission. Validates construction cost to date, reconciles to the lender requisition, confirms lien waivers by vendor and period, verifies insurance endorsements, checks compliance attestations, and evaluates cost-to-complete. Splits construction manager and asset manager responsibilities. Opens approval gates for construction manager (row 12) and, finally, for the lender submission (row 14). Final submission never goes out without approved records.
Cost-to-Complete Review
Recomputes cost-to-complete from current actuals plus remaining scope plus overlay-derived escalation and contingency. Compares against prior CTC and the underwriting baseline. Identifies the driver (labor, material, scope, duration) and recommends remediation (re-estimate, scope trim, re-bid, contingency pull).
Change Order Review
Reviews each proposed change order: validates scope basis, re-estimates cost, checks schedule impact, evaluates against contingency, recommends approval or rejection, and routes to the correct approval row by dollar threshold. Tracks `change_orders_pct_of_contract` and `contingency_burn_rate`.
Bid Leveling and Procurement Review
Normalizes and levels bids received for a defined scope. Performs apples-to-apples comparison across bidders by adjusting for included/excluded scope, allowances, alternates, and qualifications. Produces the level sheet, the recommended award, the scope clarification list, and the approval path. Every award opens a gate regardless of dollar (approval matrix row 9).